摘要
对于以地下室顶板为界面层的全逆作法来说,塔式起重机基础深化设计是一个难题,需综合考虑位置、承载力、以及与地下室顶板结构的组合等因素,以勤诚达云邸项目为依托,总结一套基于全逆作法桩柱一体化施工的塔式起重机基础设计思路及施工要点。
For the full reverse construction method with the basement roof as the interface layer,the deepening design of the tower crane foundation is a challenge.It is necessary to comprehensively consider factors such as location,bearing capacity,and the combination with the basement roof structure.Based on the Qinchengda Yundi project,this article summarizes a set of tower crane foundation design ideas and construction points based on the full reverse construction method of pile column integration construction.
作者
苏涛
刘林钊
满宁宁
谢显鹏
温庆兵
左丽娜
Su Tao;Liu Lin-zhao;Man Ning-ning;Xie Xian-peng;Wen Qing-bing;Zuo Li-na
出处
《建筑技术开发》
2023年第6期141-144,共4页
Building Technology Development
关键词
一桩一柱
逆作法
塔式起重机基础
one pile one pillar
reverse approach
tower crane foundation