摘要
为避免开采断层上盘煤层对采区煤仓造成采动影响,降低采动压对采区准备巷道的影响,对保护煤柱尺寸进行计算、分析,确定了煤仓保护煤柱尺寸,采取切顶卸压技术对采区煤仓及采区巷道进行保护,为类似地质条件下采区煤仓煤柱尺寸留设提供了宝贵经验。
In order to avoid the impact of mining the coal seam on the upper wall of the fault on the coal bunker in the mining area,and to reduce the impact of mining pressure on the preparation roadway in the mining area,the size of the protective coal pillar was calculated and analyzed,and the size of the protective coal pillar in the coal bunker was determined.The roof cutting and pressure relief technology was adopted to protect the coal bunker and the mining roadway in the mining area,providing valuable experience for retaining the size of the coal pillar in the coal bunker under similar geological conditions.
作者
付汾飞
Fu Fenfei(Fangshan Dianping Mine of Huozhou Coal Electricity Group Lvliang Mountains Coal Electricity Co.,Ltd.,Lvliang Shanxi 033102,China)
出处
《山西化工》
CAS
2023年第6期141-143,共3页
Shanxi Chemical Industry
关键词
综采工作面
保护煤柱
切顶卸压
断层
fully mechanized mining face
coal pillars protection
cutting top pressure relief
fault