摘要
目前在严寒地区城镇供热需求日益增加,因此热网管道工程项目在严寒地区冬期施工屡见不鲜,但是严寒地区的冬期施工必将伴随着施工方案复杂化、施工措施严格化、施工安全细致化、项目成本提高等问题,就热网管道在严寒地区冬期施工出现的若干问题进行分析探讨。
At present,the demand for urban heating in cold regions is increasing day by day,so the construction of heat network pipeline projects in cold regions in winter is common,but the construction in cold regions in winter will be accompanied by complicated construction scheme,strict construction measures,meticulous construction safety,project cost increase and other problems,some problems in the construction of heat network pipeline in cold regions in winter are analyzed and discussed.
作者
侯嵩
肖宝龙
牛鑫
石安迪
HOU Song;XIAO Bao-long;NIU Xin;无(Harbin Power System Engineering&Research Institute Co.,Ltd.;Harbin No.2 Municipal Engineering Co.,Ltd.)
出处
《电站系统工程》
2023年第3期75-76,共2页
Power System Engineering
关键词
热网管道
严寒地区
冬期施工
施工方案
项目成本
heat network pipeline
cold region
winter construction
construction scheme
project cost