摘要
主变系统倒送电调试过程涉及范围广、参与人员多、操作过程复杂,是垃圾焚烧发电工程试运行的前提与保证。因此,需根据电厂的实际情况,制定严谨的倒送电调试方案,以保证主变系统倒送电过程安全、有序地进行,进而确保垃圾焚烧发电工程试运行顺利。本文主要介绍了国内某垃圾焚烧发电工程主变系统倒送电调试方案,能为同类项目提供帮助和借鉴。
The commissioning process of the main transformer system's reverse power transmission involves a wide range of personnel,and the operation process is complex.It is also a prerequisite and guarantee for the trial operation of the waste incineration power generation project.Therefore,it is necessary to formulate a rigorous reverse power transmission commissioning plan based on the actual situation of the power plant.To ensure the safe and orderly progress of the main transformer system's power transfer process,and thus ensure the smooth trial operation of the waste incineration power generation project.This paper mainly introduces the commissioning scheme for the main transformer system of a domestic waste incineration power generation project,providing assistance and reference for similar projects.
作者
董俊峰
DONG Junfeng(China Aviation Planning and Design Institute Co.,Ltd.,Beijing 100083,China)
出处
《自动化应用》
2023年第11期193-195,共3页
Automation Application
关键词
垃圾焚烧
倒送电
安全措施
waste incineration
power transmission
safety measures