期刊文献+

常导磁浮预制轨道梁模板系统及施工技术研究

Study on Form Work System and Construction Technology of Precast Track Beam with Constant Conductor Maglev
下载PDF
导出
摘要 针对常导磁浮预制轨道梁成型问题,开发了一种高精度、自动化的液压式模板系统,并对其中涉及的关键技术进行了探讨。介绍了模板系统的施工流程,同时开展了预制轨道梁成型的验证性试验。结果表明,该系统实现了常导磁浮轨道梁的预制成型,从而为高精度轨道梁的成型及施工提供了一种新的模板系统方案。 Aiming at the forming problem of normally-guided maglev precast track beam,a high-precision and automatic hydraulic formwork system is developed,and the key technologies involved are discussed.The construction process of formwork system is introduced,and the verification test of precast track beam forming is carried out.The results show that the system realizes the prefabrication of the normally-guided maglev track beam,thus providing a new formwork system scheme for the forming and construction of high-precision track beam.
作者 王维兵 周林 饶剑 Wang Weibing;Zhou Lin;Rao Jian(Sichuan Wuxin Intelligent Equipment Co.,Ltd.,Chengdu,China)
出处 《科学技术创新》 2023年第18期136-139,共4页 Scientific and Technological Innovation
关键词 常导磁浮 轨道梁 预制 模板系统 成型施工 normally guided maglev track beam prefabrication template system forming construction
  • 相关文献

参考文献9

二级参考文献40

  • 1张佩竹.中低速磁悬浮技术特征及工程化研发[J].铁道标准设计,2006,26(z1):254-258. 被引量:10
  • 2吴祥明,常文森,刘万明.上海高速磁浮列车及磁浮技术发展刍议[J].综合运输,2005,27(1):28-31. 被引量:11
  • 3唐锐,吴俊泉.中低速磁浮列车在我国城轨交通中的应用前景[J].都市快轨交通,2006,19(2):12-16. 被引量:26
  • 4张佩竹,张兴昭,田连生,等.中低速磁浮列车唐山试验线方案设计[Z].天津:铁道第三勘察设计院集团有限公司,2006.
  • 5张佩竹,王俊杰,张兴昭,等.中低速磁浮列车唐山试验线施工设计[Z].天津:铁道第三勘察设计院集团有限公司,2006.
  • 6黄桂兴,张佩竹,等.中低速磁浮线路工程优化设计及测试研究[Z].天津:铁道第三勘察设计院集团有限公司,2007.
  • 7曹广忠,等.深圳市轨道交通8号线中低速磁浮交通工程运行能耗研究[R].深圳:深圳大学,2009.
  • 8上海中低速磁浮研发小组.上海中低速磁浮工程化试验线后评估报告[R].上海:上海中低速磁浮研发小组,2009.
  • 9正田英介,等.磁气浮上鉄道の技术[M].株式会社ォム社出版局,1992.
  • 10蔡文锋,徐银光,李艳.中低速磁浮交通发展与展望[C]//综合轨道交通工程建设与城市化协同发展学术交流会论文集.成都:中铁二院工程集团有限责任公司,2014.

共引文献88

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部