摘要
基础设施建设一直都是我国经济发展中的重要组成部分,在道路建设中,不可避免涉及需要对各类管线进行迁改。本文结合上海市浦东新区秀沿路(东明路—周园路,高新河—申江南路)改建工程,深入分析在复杂条件下管线搬迁方式、管线搬迁要点、交通组织优化等技术要点,以为今后类似道路改建提供经验或参考。
Infrastructure construction has always been an important part of China’s economic development,and road construction inevitably involves the relocation of various pipelines.Combined with the reconstruction project of Xiuyan Road(Dongming Road-Zhouyuan Road,Gaoxinhe-Shenjiang South Road)in Pudong New Area of Shanghai,this paper analyzes the key technical points such as pipeline relocation methods,pipeline relocation points,and traffic organization optimization under complex conditions,so as to provide experience or reference for similar road reconstruction in the future.
作者
王俊秀
Wang Jun-xiu(Shanghai Pudong Engineering Construction Management Co.,Ltd.,Shanghai 200120,China)
出处
《建筑与装饰》
2023年第13期85-87,共3页
Construction & Decoration
关键词
城市次主干路
管线搬迁
管线保护
交通组织
urban secondary trunk road
pipeline relocation
pipeline protection
traffic organization