摘要
T梁构件在桥梁工程和码头工程中有着广泛应用,为探究海上起重船架设T梁工艺的可行性与特点,结合华电丰盛汕头电厂“上大压小”新建项目配套码头工程A标段施工实例,通过分析方案比选、起重船选型、吊索与卡环验算、专用吊架设置与应力比验算、T梁安装过程等要点,证实了该工艺便捷、工期短、成本低、安全可靠等优势,也为将来类似工程提供参考与借鉴。
With the wide use of T-beam components in bridge and port construction,in order to explore the feasibility and characteristics of erecting T-beams with offshore floating crane,based on the construction practice in the execution of Contract Package I for the auxiliary wharf project for Huadian Fengsheng Shantou Power Plant,the advantages of technology for erecting T-beams with offshore floating cranes are verified by analyzing the key points such as scheme comparison,floating crane selection,sling and shackle checking,special hanger setting and stress ratio calculation,and T-beam installation process,thus confirming the advantages of the technology as simple and convenient,with short construction period,low cost,safety and reliability.It may also provide reference for similar projects in the future.
作者
谭伟军
张勇发
陶超
TAN Wei-jun;ZHANG Yong-fa;TAO Chao(Second Eng.Co.,Ltd.of CCCC First Harbor Engineering Co.,Ltd.,Qingdao,Shandong 266071,China;CCCC First Harbor Engineering Co.,Ltd.,Tianjin 300461,China)
出处
《中国港湾建设》
2023年第7期30-35,共6页
China Harbour Engineering
关键词
起重船
海上T梁安装
方案比选
floating crane
offshore T-beam installation
scheme comparison and selection