摘要
为解决大型泵站机电设备安装复杂问题,避免由安装不当造成的异常振动、超电流风险,保障大型泵站的平稳、有序运行,文章引入某地输水工程泵站设备安装案例,先简要介绍工程概况,然后从实践角度出发归纳机电设备安装施工思路与流程,从低压电气设备安装、配电房设备安装等方面入手梳理细节,提出了严格放样测量、及时验收调试等建议,希望能为相关从业者提供技术借鉴。
In order to solve the complex installation problem of electromechanical equipment in large-scale pumping stations,avoid the risk of abnormal vibration and overcurrent caused by improper installation,and ensure the smooth and orderly operation of large-scale pumping stations,this paper introduces a case of equipment installation in pumping stations of a local water transmission project,first briefly introduces the project overview,then summarizes the ideas and processes of electromechanical equipment installation from a practical point of view,and sorts out the details from the aspects of low-voltage electrical equipment installation and distribution room equipment installation,and proposes suggestions such as strict lofting measurement,timely acceptance and commissioning.It is hoped to provide technical reference for relevant practitioners.
作者
许玲
Xu Ling(Huainan City Nihe Hub Management Office,Huainan 232000,Anhui Province,China)
出处
《科学与信息化》
2023年第14期94-96,共3页
Technology and Information
关键词
大型泵站
机电设备
安装技术
large-scale pumping station
electromechanical equipment
installation technology