摘要
在电力系统中,气体绝缘开关(Gas Insulated Switchgear,GIS)设备占有很大的比重,被广泛应用于各级变电站。但是,在电网建设的过程中,由于环境问题会对GIS设备安装产生阻碍,必须采用防尘设施来进行防护,保证安装质量。近年来,国家电网有限公司数次制定相关政策和标准,用来指导现场的GIS无尘化、标准化作业。基于此,提出GIS无尘化施工防尘设施及全过程管控系统,解决GIS设备安装中的防尘问题。
In the power system,Gas Insulated Switchgear(GIS)equipment occupies a large proportion and is widely used in substations at all levels.However,in the process of power grid construction,GIS equipment installation is hindered by environmental issues,and dustproof facilities must be used to protect and ensure the quality of installation.In recent years,the National Grid Corporation has formulated relevant policies and standards several times,which are used to guide the dust-free and standardized operation of GIS on site.Based on this,GIS dust-free construction dustproof facilities and the whole process control system are proposed to solve the dustproof problem in GIS equipment installation.
作者
刘金柱
孙斌
陈怡光
庞孝乐
张迪
王国瑞
LIU Jinzhu;SUN Bin;CHEN Yiguang;PANG Xiaole;ZHANG Di;WANG Guorui(Henan Power Transmission and Transformation Construction Co.,Ltd.,Zhengzhou 450000,China)
出处
《通信电源技术》
2023年第9期242-245,共4页
Telecom Power Technology
关键词
电力系统
气体绝缘开关(GIS)设备安装
标准化
防尘措施
electric power system
Gas Insulated Switchgear(GIS)equipment installation
standardization
dustproof measures