摘要
文章以杭州彩虹快速路西延工程6座明挖隧道工程为案例,对运行后的明挖隧道出现的渗漏水原因进行分析,针对不同位置、不同渗漏水量等情况的渗漏水治理,阐述不同的治理方法,为类似明挖隧道和其他地下工程的渗漏水治理方法积累经验。
The article takes the six open cut tunnels of the Hangzhou Rainbow Expressway West Extension Project as a case study to analyze the causes of leakage water in the open cut tunnels after operation.Different treatment methods are elaborated for leakage water treatment in different locations and different leakage volumes,accumulating experience for similar open cut tunnels and other underground engineering leakage water treatment methods.
作者
郭玉达
GUO Yuda(Hangzhou Construction Engineering Quality and Safety Supervision Station,Hangzhou,Zhejiang,310005,China)
出处
《工程建设(维泽科技)》
2023年第9期155-159,共5页
Engineering Construction
关键词
明挖隧道
渗漏水
原因分析
治理
open cut tunnel
water leakage
cause analysis
control