摘要 水电站在推动区域经济发展中发挥着非常重要的作用,而水库则是水电站正常运转的核心保障。如果水库本身存在有相应的安全风险,轻则影响水电站的运行,严重时可能引发重大事故。基于此,做好水电站病险水库安全风险分析以及除险加固设计,也就显得十分必要。结合乳源县寨潭电站项目的实际情况,对其在运行中存在的安全风险进行了分析,提出了相应的除险加固设计方案。通过对方案的合理应用,电站存在的安全风险得到了有效防控,大坝的使用寿命得到了延长,整体加固效果显著。 Hydropower station plays a very important role in promoting regional economic development,and reservoir is the core guarantee for the normal operation of hydropower station.If there are corresponding safety risks in the reservoir itself,it will affect the operation of the hydropower station,and even cause major accidents.Based on this,it is very necessary to do a good job in the safety risk analysis and reinforcement design of the sick reservoir of hydropower station.Combined with the actual situation of Zhaitan power station project in Ruyuan County,the existing safety risks in operation are analyzed,and the corresponding design scheme of risk prevention and reinforcement is put forward.Through the rational application of the scheme,the safety risk of the power station has been effectively prevented and controlled,the service life of the dam has been extended,and the overall reinforcement effect is remarkable.
作者 王永清 WANG Yongqing(Shaoguan Water Resources and Hydropower Survey and Design Consulting CO.LTD.,Shaoguan 512000,China)
出处 《河南水利与南水北调》 2023年第5期40-42,共3页 Henan Water Resources & South-to-North Water Diversion
关键词 水电站 病险水库 安全风险 除险加固 hydropower station sick reservoir security risks danger removal and reinforcemen
  • 相关文献

参考文献5

二级参考文献19

共引文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部