期刊文献+

冬夏季施工技术措施分析研究

Analysis of Construction Technical Measures in Winter and Summer
原文传递
导出
摘要 冬夏季节是工程项目施工的特殊时期,必须做好施工技术分析研究,以达到施工质量符合设计标准。冬季施工过程中,针对冬季施工的基本内容,积极组织专人编制冬季施工技术措施,重点做好混凝土工程施工包括混凝土施工准备、拌合站控制及运输控制等技术措施,同时做好温度观测和施工组织,总体上注意冬季安全与防火。夏季多雨需要防洪,包括混凝土温度控制、防雨及雨季施工前准备、雨季施工技术措施和防汛。结合具体工程实例探索冬夏季施工技术实施基本规律,为水利工程施工提供科学指导。 Winter and summer season are special period of project construction.The construction technology analysis and research must be done well to achieve the construction quality in line with the design standard.In the process of winter construction,winter construction technical measures are actively organize specially prepared in view of the basic content of winter construction.Concrete engineering construction is focused on,which includes concrete construction preparation,mixing station control and transportation control and other technical measures.While doing a good job of temperature observation and construction organization,generally pay attention to safety and fire prevention in winter.It requires flood control in rainy summer.The flood control includes concrete temperature control,rain prevention and construction preparation before rainy season,construction technical measures in rainy season and flood control.Combined with specific engineering examples,the basic law of construction technology implementation in winter and summer is explored to provide scientific guidance for hydraulic engineering construction.
作者 周林政 ZHOU Linzheng(Jiangxi Provincial Water Conservancy and Hydropower Construction Group CO.LTD.,Nanchang 330025,China)
出处 《河南水利与南水北调》 2023年第5期72-73,共2页 Henan Water Resources & South-to-North Water Diversion
关键词 冬雨季施工 雨季施工前准备 混凝土施工技术 分析研究 winter and rainy season construction preparation before construction in rainy season concrete construction technology analysis and research
  • 相关文献

参考文献3

二级参考文献19

共引文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部