摘要
文章参照临近库车河的兰干水文站相关数据资料,对盐水沟堤防工程设计洪峰流量计算方法进行分析,重点对模数法、推理公式法、地区综合频率曲线法三种方法推求进行比较,比较结果表明采用洪峰流量模比系数地区综合频率曲线法,更适合作为库车市盐水沟堤防工程设计洪峰流量计算方法。
With reference to the relevant data of the Langan Hydrological Station near the Kuqa River,the calculation method of the design flood peak flow of the Yanshui Ditch embankment project is analyzed in the paper.The comparison of three methods,modulus method,inference formula method and regional comprehensive frequency curve method,is emphasized.The comparison results show that the regional comprehensive frequency curve method of the peak flow modulus coefficient is more suitable for calculating the peak discharge of Yanshui Ditch embankment project in Kuqa City.
作者
李霄
LI Xiao(Xinjiang Uygur Autonomous Region Water Conservancy Management Station,Urumqi 830001,China)
出处
《河南水利与南水北调》
2023年第5期95-97,共3页
Henan Water Resources & South-to-North Water Diversion
关键词
盐水沟
堤防设计
洪峰流量计算
Yanshui Ditch
embankment design
peak discharge calculation