文章结合滇中引水水利工程高边坡预应力锚索施工进行的基本试验,阐述了锚索基本试验方案,介绍了试验锚索施工工艺过程,验证了相关地层锚索设计参数,对相关试验结果进行了整理分析,可供同类工程施工时参考。
This paper presents the basic experiments conducted during the construction of pre-stressed anchor cables for high slopes in a specific water conservancy project.It describes the experimental plan for the anchor cables and provides an overview of the construction process.The design parameters for the anchor cables in the corresponding geological formations are verified,and the experimental results are analyzed and summarized.This information can serve as reference for similar construction projects.