摘要
阐述远动通道数据的迁移方案,变电站到各级调度主站的通道状况、不同类型远动通道的特点。在厂站端实现新、旧远动机的并列运行,使远动通道数据在与各级调度主站的新旧通道之间正常交互。
This paper expounds the migration plan of remote control channel data,the channel conditions from substations to various levels of dispatch main stations,and the characteristics of different types of remote control channels.Implement paraliel operation of new and old remote control machines at the factory station end,enabling normal interaction between remote control channel data and the new and old channels of various levels of dispatch main stations.
作者
吴艾琳
WU Ailin(Shantou Power Supply Bureau of Guangdong Power Grid Co.,Ltd.,Guangdong 515044,China)
出处
《电子技术(上海)》
2023年第6期252-253,共2页
Electronic Technology
关键词
自动化改造
远动通道
数据迁移
automation transformation
telecontrol channel
data migration