摘要
介绍了黔北电厂一单元脱硫DCS系统升级改造的实施情况,使用混改方式对系统进行了升级,20天左右便完成了升级改造,该方案省时、省费用,值得借鉴。
The implementation of the upgrading and transformation of the desulfurization DCS system of unit 1 of Qianbei power plant is introduced.The system was upgraded by means of mixed transformation.The transformation of a single unit was completed in about 20 days.The scheme proposed in this paper saves time and cost,and is worth learning.
作者
杨军
YANG Jun(Qianbei Power Plant of Guizhou West Electric Power Co.,Ltd.,Jinsha 551800,China)
出处
《电工技术》
2023年第12期18-20,共3页
Electric Engineering