Origin曲面函数拟合沉桩完成面辅助PHC管桩静压施工

Fiting Completion Surface of Pile Sinking with Origin Curved Surface Function to Assist PHC Pipe Pile Static Pressure Construction
下载PDF
导出
摘要 为解决建筑桩基工程施工工艺存在的问题,提升建筑桩基工程施工工艺和进度水平,应用Origin曲面函数对沉桩完成面进行拟合,以辅助预应力高强混凝土管桩的静压施工。新方法提高了建筑桩基工程的施工进度,取得了较好的经济效益,可供预应力高强混凝土管桩静压施工时进行参考。 In order to solve the problems of the construction process of building pile foundation engineering and improve the construction process and progress of building pile foundation engineering,the Origin surface function is applied to fit the sunken pile completion surface to assist the hydrostatic construction of prestressed high-strength concrete pipe piles.The new method improves the construction progress of construction pile foundation engineering and achieves better economic benefits,which can be used for reference during the hydrostatic construction of prestressed high-strength concrete pipe piles.
作者 黄海标 梁冬瑶 张媛媛 黄后玉 HUANG Haibiao;LIANG Dongyao;ZHANG Yuanyuan;HUANG Houyu(Guangxi Road Construction Group Construction Engineering Co.,Ltd.,Nanning 530022,Guangxi,China)
出处 《建筑施工》 2023年第7期1321-1323,共3页 Building Construction
关键词 桩基工程 ORIGIN软件 预应力高强混凝土管桩 辅助施工 pile foundation engineering Origin software prestressed high-strength concrete pipe pile auxiliary construction
  • 相关文献

参考文献1

二级参考文献3

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部