摘要
以星火站交通枢纽工程为依托,针对施工中遇到的复杂深基坑邻近既有结构施工、大跨度钢结构网壳屋架施工、TOD模式枢纽地铁一体化施工等问题,介绍BIM技术在星火站交通枢纽施工重点与难点问题解决过程中的应用,可为后续类似工程施工提供借鉴。
Taking the transportation hub of Xinghuo station as an example,the application of BIM technology to address key problems and difficulties in the transportation hub construction of Xinghuo Station was introduced,such as the construction of complete deep foundation pits adjacent to existing structures,construction of reticulated shells and roof trusses of large-span steel structures and integrated construction of TOD hubs,thus providing a reference for similar projects in the future.
作者
姜同兴
伍锦鹏
白磊
王林
刘香会
叶超
JIANG Tong-xing;WU Jin-peng;BAI Lei;WANG Lin;LIU Xiang-Hui;YE Chao(BCEG Civil Engineering Co.,Ltd.,100015,Beijing,China)
出处
《建筑技术》
2023年第15期1850-1852,共3页
Architecture Technology
关键词
交通枢纽
BIM技术
大跨度钢结构网壳
一体化施工
transportation hub
bim technology
reticulated shell of large-span steel structure
integrated construction