摘要
针对三洞隧道开挖引起的地表沉降规律,以南通轨道交通1号线孩-环区间盾构隧道工程为依托工程,采用现场数据监测、理论分析和数值模拟,研究了三洞并行盾构隧道施工对地表沉降规律的影响。研究结果表明:提出一种计算三洞并行隧道开挖地表沉降曲线的“三阶段分析法”,综合比较“三阶段分析法”得到的沉降预测曲线、现场沉降实测数据的拟合曲线及数值模拟的沉降计算曲线可知,提出的“三阶段分析法”和数值模拟方法均能较好地反映三洞并行盾构隧道的真实施工情况。
Focusing on the settlement law of the ground surface caused by the excavation of the three-parallel tunnel,and based on the shield tunnel engineering in Hai–Huan section of Nantong Rail Transit Line 1,this paper studied the influence of the construction of the three-parallel shield tunnel on the settlement law of the ground surface by field data monitoring,theoretical analysis,and numerical simulation.As a result,a"three-stage analysis"for calculating the surface settlement curve of excavation of the three-parallel tunnel was proposed.Comprehensively comparing the settlement prediction curve obtained from the"three-stage analysis",the fitting curve of field settlement data,and the settlement calculation curve from the numerical simulation,both the"three-stage analysis"and the numerical simulation can well reflect the real construction situation of the three-parallel shield tunnel.
作者
曾波
ZENG Bo(Fifth Engineering Co.,Ltd.of CREGC,Chengdu,Sichuan 610031,China)
出处
《山西交通科技》
2023年第3期107-110,127,共5页
Shanxi Science & Technology of Transportation
基金
国家自然科学基金(51778633、51308552)
2020年中国中铁股份有限公司科技研究开发计划引导课题(41、243)
中铁二局集团有限公司科技研究开发计划课题(2022-B-4)。
关键词
三洞并行
盾构隧道
地表沉降
数值模拟
three-parallel
shield tunnel
ground surface settlement
numerical simulation