一起110 kV组合电器SF6气体泄漏处理与分析

Treatment and Analysis of SF6 Gas Leakage of 110 kV Gas Insulated Substation
下载PDF
导出
摘要 某变电站110 kV组合电器设备存在漏气问题,检修人员对其进行SF6带电补气后,结合现场情况,应用多种检漏技术开展漏气点查找,发现组合电气GIS设备漏气原因并提出处理方案,彻底解决了该组合电器气室漏气问题,避免了SF6气体长期泄露导致设备事故的发生,保证设备安全稳定运行。 The 110 kV combined electrical equipment in a substation has air leakage problem.After the maintenance personnel carried out SF6 live air supply for it,combined with the site situation,they applied a variety of leak detection technologies to find the leak point,found the cause of air leakage of the combined electrical GIS equipment and proposed a solution,which thoroughly solved the air leakage problem of the combined electrical equipment gas chamber,avoided the occurrence of equipment accidents caused by long-term SF6 gas leakage,and ensured the safe and stable operation of the equipment.
作者 尚嘉诚 SHANG Jiacheng(Ningdong power supply company of State Grid Ningxia Electric Power Co.,Ltd,Ningxia Lingwu 751400,China)
出处 《农村电气化》 2023年第7期78-79,共2页 Rural Electrification
关键词 组合电器 SF6 漏气处理 gas insulated substation SF6 gas leakage treatment
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部