沙特阿美马赞项目配管接工艺评定管理

Piping Welding Procedure Specification Management for Project Marjan-Saudi Aramco
下载PDF
导出
摘要 通过深入研究沙特阿美马赞EPC建造项目OOK合同项下的陆地建造配管管线焊接工艺评定工作,总结了其OOK合同项下配管管线焊接工艺评定执行的特点,详细介绍了其特殊要求、报批流程、审批特点及应对策略,提出了诸多可借鉴和学习的经验教训和应对策略,为今后沙特阿美海上油气田项目执行配管管线焊接工艺评定和施工的可持续性改进提供了参考。 Through in-depth study of welding procedure specification(WPS)of onshore piping construction work under the OOK contract of project Saudi Aramco Marjan,the characteristics of welding procedure specification implementation under OOK contract were summarized.The special requirements,application process,characteristics of approval and countermeasures are introduced in details.Putting forward many lessons learned and countermeasures,which can be used for reference and study for the sustainable improvement of piping1 welding procedure specification and construction of Saudi Aramco offshore oil and gas field projects in the future.
作者 王自发 李潇 徐宽 焦晓峰 王晓晅 刘淑艳 WANG Zi-fa;LI Xiao;XU Kuan;JIAO Xiao-feng;WANG Xiao-xuan;LIU Shu-yan(COOEC International Engineering Co.,Ltd.,Tianjin 300461,China;Offshore Oil Engineering Co.,Ltd.,Tianjin 300461,China)
出处 《化工管理》 2023年第24期152-154,164,共4页 Chemical Engineering Management
关键词 沙特阿美 海上油气项目OOK合同 配管焊接工艺评定 全面焊接管理 Saudi Aramco offshore oil&gas OOK contract piping welding procedure specification total welding management
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部