田湾核电二期主凝结水泵二切一运行分析

Analysis on the Operation of“Tow Cut One”for the Main Condensate Pump of Tianwan Phase II Project
下载PDF
导出
摘要 田湾3号机组100%额定功率凝泵切除试验(二切一)中发现RUPL动作结束后,堆功率维持在49%额定功率,但除氧器液位仍缓慢下降。表明一台凝结水泵无法维持50%额定功率,如果操纵员不干预,事件最终将发展为所有蒸汽发生器失去给水。从原理着手分析,得出一台主凝结水泵能维持的功率水平应为40%额定功率。将一台凝泵运行的RUPL限值由50%额定功率改为40%额定功率后,试验结果表明一台凝结水泵可以维持40%额定功率并在凝泵二切一的扰动下保证除氧器液位。 In the 100%rated power condensate pump excision test of Tianwan Unit 3(two cuts one),it was found that after the RUPL operation,the reactor power remained at 49%rated power,but the liquid level of the deaerator still decreased slowly.This indicates that one condensate pump was unable to maintain 50%of its rated power.If the manipulator did not intervene,the event would eventually develop into a loss of feed water to all steam generators.The principle analysis was carried out,and it was concluded that a main condensate pump can maintain 40%of the rated power.After changing the RUPL limit of a condensate pump from 50%rated power to 40%rated power,the test results show that a condensate pump can maintain 40%rated power and ensure the deaerator liquid level under the disturbance of two cut one of the condensing pump.
作者 詹志和 ZHAN Zhihe(China Nuclear Power Jiangsu Nuclear Power Co.,Ltd.,Lianyungang 222000,China)
出处 《电工技术》 2023年第13期238-240,243,共4页 Electric Engineering
关键词 核电站 主凝结水泵 二切一 RUPL nuclear power station main condensate pump two cut one RUPL
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部