摘要
为提升工程建设的整体质量,需要分析当前复杂地基深基坑岩土工程勘察任务。本文叙述了工程项目的大框流程,分析了复杂地基深基坑岩土工程勘察技术,强调了岩土取样的方法和测绘手段在勘察技术中的具体应用,陈述了其适用的工程类型和具体落实流程进行。进而引出完善岩土工程项目的具体措施,叙述利用培训增加专业人员技术水平,使其增加理论与实践结合能力的重要性。工程单位要建设完善的施工管理制度保障技术应用流程的规范程度。明确地质钻探流程和实地考察取样的方法,提高复杂地基深基坑岩土工程勘察效果。
In order to improve the overall quality of engineering construction,it is necessary to analyze the current geotechnical investigation task of complex foundation deep foundation pit.This paper describes the large frame process of the engineering project,analyzes the geotechnical survey technology of the complex foundation deep foundation pit,emphasizes the specific application of the geotechnical sampling method and mapping methods in the survey technology,and states the applicable engineering type and the specific implementation process.Then lead to the specific measures to improve the geotechnical engineering projects,describe the importance of using training to increase the technical level of professionals,and make it increase the ability of combining theory and practice.The engineering unit should build a perfect construction management system to ensure the standard degree of the technology application process.The geological drilling process and field investigation and sampling methods are clarified to improve the geotechnical investigation effect of complex foundation deep foundation pit.
作者
李金坤
黄姣
LI Jin-kun;HUANG Jiao(The Third Geological Brigade of Jiangxi Geological Bureau,Jiujiang 332100,China)
出处
《世界有色金属》
2023年第9期208-210,共3页
World Nonferrous Metals
关键词
复杂地基
深基坑
岩土工程
勘察技术
complex foundation
deep foundation pit
geotechnical engineering
survey technology