摘要
深基坑是当前建筑工程中的常见形式和重要组成部分,其受地质条件的影响显著,施工条件较为复杂、专业性较强。因此在施工中存在诸多难点和重点,为有效保障工程复杂结构深基坑作业的合理性和有序性,应利用BIM等现代技术手段,为具体施工环节提供辅助和支持功能。鉴于此,文章以惠州大亚湾第一水质净化厂三期工程为例,分析基坑BIM模型的创建方法,探究BIM模型的具体应用,并对BIM技术在该工程复杂结构深基坑中的创新应用开展详细研究,旨在为相关工程项目提供借鉴和参考。
Deep foundation pit is a common form and important part of current construction engineering.It is significantly affected by geological conditions,and the construction conditions are more complex and professional.Therefore,there are many difficulties and key points in the construction.In order to effectively guarantee the rationality and orderliness of the deep foundation pit operation with complex structures in engineering,modern technical means such as BIM should be used to provide auxiliary and supporting functions for the specific construction links.In view of this,taking Daya Bay No.1 Water Purification Plant Phase Ⅲ Project in Huizhou as an example,this paper analyzes the creation method of BIM model of the foundation pit,explores the specific application of BIM model,and carries out detailed research on the innovative application of BIM technology in the complex structure deep foundation pit in engineering,aiming to provide reference for related engineering projects.
作者
李焕宏
LI Huanhong(Guangdong Water Conservancy and Hydropower Third Engineering Bureau Co.,Ltd.,Dongguan 523710,Guangdong,China)
出处
《工程技术研究》
2023年第11期48-50,共3页
Engineering and Technological Research
关键词
BIM技术
复杂结构
深基坑
水质净化厂
BIM technology
complex structure
deep foundation pit
water purification plant