快速路复杂节点地下互通建造风险及控制措施研究

Research on Risks&Control Measures of Underground Interchange Construction at Complex Nodes of Expressway
下载PDF
导出
摘要 地下互通立交受工法工艺的影响,在周围环境敏感、节点复杂的情况下,存在较大的施工风险。以上海漕宝路快速路穿越外环线(S20)节点为工程背景,对S20外环节点的周边环境进行介绍,通过对工程所涉及的深基坑开挖、盾构掘进和顶管施工的风险辨识,提出了该工程的5大类风险:主线及地下互通立交深基坑开挖风险、盾构近距离穿越S20跨线桥桩基础风险、大断面顶管穿越S20施工风险、基坑上跨轨道交通L9施工风险、施工对周边环境影响风险。同时,针对前述5大类风险进行施工风险控制措施的总结,可为类似工程提供相关经验。 Under the influence of construction method and technology,underground interchange has great construction risk when the surrounding environment is sensitive and the joints are complicated.Taking the Shanghai Caobao Road Expressway crossing the Outer-Ring Road(S20)node as the engineering background,the surrounding environment of the S20 Outer-Ringnode is introduced.Through risk identification of deep foundation pit excavation,shield tunneling&pipe jacking construction involved in the project,five major risks of the project are proposed:deep foundation pit excavation risk of main line&underground interchange,pile foundation risk of shield crossing S20 bridge in short distance,construction risk of large section pipe jacking crossing S20,construction risk of trans-rail transit L9 on foundation pit,and construction impact risk on the surrounding environment.At the same time,a summary of construction risk control measures for the five major types of risks mentioned above can provide relevant experience for similar projects.
作者 强晓 QIANG Xiao(Shanghai Huangpu River Crossing-River Facilities Investment&Construction Development Co.,Ltd.,Shanghai 200093,China)
出处 《中国市政工程》 2023年第4期20-24,104,共6页 China Municipal Engineering
关键词 地下快速路 地下互通 复杂节点 风险辨识 控制措施 underground expressway underground interchange complex nodes risk identification control measures
  • 相关文献

参考文献11

二级参考文献59

共引文献127

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部