摘要
球形储罐制造分两阶段,第一阶段为制造厂球壳板压制,第二阶段为现场组装焊接,本文分两部分分别讲述在这两个制造阶段所进行的相关检验。
The spherical tank is manufactured in two stages.The first stage is spherical shell plate pressing in the manufacturer,the second stage is on-site assembly and welding.This article is divided into two parts,describing the relevant inspections performed during these two manufacturing stages respectively.
作者
张晓伟
耿志铭
Zhang Xiaowei;Geng Zhiming(Dalian Jinzhou Heavy Machinery Group Co.,Ltd.,Dalian 116100)
出处
《中国化工装备》
CAS
2023年第4期27-32,共6页
China Chemical Industry Equipment
关键词
球形储罐
球壳板
支柱
组焊检验
位移
基础沉降
spherical tank
spherical shell plate
pillar
assembly welding inspection
displacement
foundation settlement