结合李家岩输水管道工程的实际情况,对其混凝土全包封输水管道施工技术进行了深入分析研究,提出了施工中需要注意的各项要点并予以解决,取得了较好的效果,所取得的经验可为类似工程提供参考。
Combined with the actual situation of Lijiayan Water Transmission Pipeline Project,this paper makes an in-depth analysis and research on the construction technology of its concrete fully encapsulated water transmission pipeline,and puts forward various points that need to be paid attention to during construction,which have worked effectively.The experience gained can provide reference for similar projects.
作者
许可
朱国林
林刚
孔令炀
XU Ke;ZHU Guolin;LIN Gang;KONG Lingyang(Sinohydro Bureau 10 Co.,Ltd.,Chengdu Sichuan 610036)
出处
《四川水力发电》
2023年第4期45-49,共5页
Sichuan Hydropower
关键词
输水工程
混凝土全包封输水管道
施工技术
李家岩水库
Water conveyance project
Concrete fully encapsulated water transmission pipeline
Construction technology
Lijiayan Reservoir