摘要
锅浪跷水电站厂房钢网架,离地面高度近20 m,面积1200 m^(2),钢材选择、构件制作、焊接处理、构件装配、涂装处理均关系到整个厂房工程的施工质量。网架施工难度大,施工技术要求高,施工安全威胁大;而锅浪跷水电站厂房钢网架采用的施工技术,满足实际施工要求,经实践证明,施工方法安全可靠。
The steel grid of powerhouse of Guolangqiao Hydropower Station is nearly 20m from the ground,and the construction area is 1200 m^(2).The steel selection,component making,welding treatment,component assembly and coating treatment are all related to the construction quality of the whole powerhouse.Grid construction is difficult,with high technical requirements and great safety threat.While the construction technology of steel grid adopted in the powerhouse of Guolangqiao Hydropower Station meets the actual construction needs and proves the construction method to be safe and reliable.
作者
李德政
白雷雷
LI Dezheng;BAI Leilei(Sinohydro Bureau 10 Co.,Ltd.,Dujiangyan Sichuan 611830;Datang Ya'an Electric Power Development Co.,Ltd.,Ya'an Sichuan 625500)
出处
《四川水力发电》
2023年第4期134-138,共5页
Sichuan Hydropower
关键词
水电站
钢网架厂房
施工方法
Hydropower station
Steel grid powerhouse
Construction method