摘要
为了实现安全开采,针对铺龙湾煤业8106工作面制定了防治水措施。分析了该工作面的水文地质情况,主要包括水源和导水通道情况;根据水文地质情况,制定了相应的防治水措施。在防治水过程中,应重点关注采空冒裂带形成的垂向导水通道。可为煤矿防治水工作的开展提供一定的技术指导。
In order to achieve safe mining,water prevention and control measures have been formulated for 8106 working face of Pulongwan Coal Industry Co.,Ltd.The hydrogeological conditions of the working face were analyzed,mainly including the water source and diversion channel conditions;based on the hydrogeological conditions,corresponding water prevention and control measures were formulated.In the process of water prevention and control,special attention should be paid to the vertical guide water channel formed by the goaf fracture zone.It can provide certain technical guidance for the implementation of water prevention and control work in coal mines.
作者
苏辉
SU Hui(Shanxi Pulongwan Coal Industry Co.,Ltd.,Zuoyun 037100,Shanxi,China)
出处
《能源与节能》
2023年第7期177-179,共3页
Energy and Energy Conservation
关键词
煤矿开采
地质防治水
防治水措施
coal mining
geological water prevention and control
water prevention and control measures