摘要
文章以旭龙水电站高位自然边坡治理为背景,通过研究施工通道所需材料和设备的运输方式以及通道布设方式,确定采用缆索吊运输方式,以及搭建防护栏杆、钢梯、钢栈桥构建施工通道,解决了高位自然边坡治理施工运输的难题,加快了施工进度,缩短了工期,节约了施工成本。该电站高位自然边坡治理施工通道及材料运输难题的解决经验,可为其他类似工程提供借鉴。
Taking the high natural slope treatment of Xulong Hydropower Station as the background by studying the transportation mode of materials and equipment required for the construction channel and the channel layout mode the cable crane transportation mode is determined and the construction channel is constructed by building protective railings steel ladders and steel trestles.The problem of construction and transportation of high natural slope treatment is solved the construction progress is accelerated the construction period is shortened and the construction cost is saved.The experience of solving the construction channel and material transportation problems of the high natural slope treatment of the power station can provide reference for other similar projects.
作者
雷雪
LEI Xue(China Anneng Group First Engineering Bureau Co.Ltd.,Nanning 530200 China)
出处
《红水河》
2023年第4期43-47,共5页
Hongshui River
关键词
高位自然边坡
施工通道
运输难题
旭龙水电站
high natural slope
construction channel
transportation problems
Xulong Hydropower Station