为推动我国实现浮动核电站工程建设,本文结合国内外浮动核电站发展趋势,提出了ACP100S船坞式浮动核电站初步方案,并对船坞式浮动核电站在外部事件、反应堆设计、船体设计、经济性、水电气联供实现性、应急安全、电站扩展部署技术等几个方面进行了初步分析,给出了“近岸浮动核电站”—“远海浮动核电站”两步走的发展建议,对于早日实现我国浮动核电站建设具有一定的指导意义。
Considering the domestic and overseas development trend of floating nuclear power plant(FNPP),a dock-based ACP100S FNPP is proposed in this paper to promote the construction of FNPP in China.A preliminary evaluation is conducted in the external event,nuclear reactor design,hull design,economic analysis,water-electric-gas cogeneration,emergency safety,and plant deployment.A two-step construction mode is suggested from“offshore FNPP”to“open sea FNPP”.The dock-based ACP100S FNPP provides a meaningful solution for the early engineering construction in our country.
作者
王东辉
李庆
宋丹戎
秦冬
刘佳
Wang Donghui;Li Qing;Song Danrong;Qin Dong;Liu Jia(Science and Technology on Reactor System Design Technology Laboratory,Nuclear Power Institute of China,Chengdu,610213,China;National Energy Offshore Nuclear Power Platform Technology Research Center,Chengdu,610213,China)
出处
《核动力工程》
EI
CAS
CSCD
北大核心
2023年第4期1-8,共8页
Nuclear Power Engineering
基金
国家重点研发计划(2017YFC0307800)。