大型固定式海洋平台上部结构拆解方案 被引量:1

Dismantling Plan for the Superstructure of Large Fixed Offshore Platform
下载PDF
导出
摘要 为制订合理有效的大型固定式海洋平台拆解方案,通过对吊装法、单船浮托法和双船浮托法等典型方法及相关装备的应用现状和技术特点进行比较分析,得出各种方案的技术优势和适用条件。研究发现:双船浮托式拆解法具有拆解效率高和拆解目标尺寸受限小的优点,在海洋平台拆解领域具有很大的应用潜力;双船浮托式拆解作业过程对作业精度的要求较高,通过与DP3动力定位浮托系统相结合,有望成为未来海洋平台拆解的主流技术。 In order to develop a reasonable and effective dismantling plan for the large fixed offshore platforms,the application status and technical characteristics of typical techniques and related equipment including lifting method,single ship floating method,and double ship floating method are compared and analyzed,to find out the technical advantages and applicable conditions of each plan.Research shows that the dual ship floating disassembly method has the advantages of high disassembly efficiency and small size constraints on the disassembly target,which provides great potential for application in the field of offshore platform disassembly.The process of dual ship floating disassembly requires high precision.When combined with DP3 dynamic positioning floating system,it is hopeful to be the major technique for the future oil platform disassembly.
作者 孙涛 逄仁德 郭培军 李云峰 SUN Tao;PANG Rende;GUO Peijun;LI Yunfeng(Shandong Offshore Equipment Co.,Ltd.,Qingdao 266580,China;Shandong Offshore Research Institute Co.,Ltd.,Qingdao 266580,China)
出处 《船舶与海洋工程》 2023年第4期14-19,共6页 Naval Architecture and Ocean Engineering
关键词 平台拆解 吊装法 浮托法 动力定位 platform dismantling hoisting method floating supporting method dynamic positioning
  • 相关文献

参考文献9

二级参考文献28

共引文献58

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部