期刊文献+

梳理工程总承包模式中几个常见的问题

Sortingout tSeveral Common Problems in General Contracting Model
下载PDF
导出
摘要 工程总承包作为近年政府积极推广的一种工程建设模式,得到了政府、设计方、施工方等相关主体的极大关注,但在其推行过程中仍存在一些不是十分清晰的概念和操作方式。论文从工程总承包的模式和内容、适用项目和参与公司、发包时间和各时段的优劣、合同价格形式及其优劣等几个相对模糊的方面进行阐述梳理,从而明晰思路,以期有利于工程总承包的健康发展。 As a project construction mode actively promoted by the government in recent years,general contracting model has received great attention from the government,design companies,construction companies and other relevant entities,but there are still some unclear concepts and operating methods in the process of its implementation.This article elaborates and sorts out several relatively vague aspects,such as the mode and content of general contracting,applicable projects and participating companies,contract issuance time and the pros and cons of each time period,contract price form and its pros and cons,so as to clarify ideas and hope to benefit The healthy development of general contracting.
作者 欧阳高奇 颜颖 OUYANG Gao-qi;YAN Ying(China Urban Construction Design&Research Institute,Beijing 100120,China;Beijing City University,Beijing 100083,China)
出处 《工程建设与设计》 2023年第11期238-240,共3页 Construction & Design for Engineering
关键词 工程总承包 EPC 发包时间 合同价格 general contracting EPC delivery time contract price
  • 相关文献

参考文献4

二级参考文献1

共引文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部