摘要 文章主要介绍了阳江400MW特大型抽水蓄能机组调速系统的设计特点及现场应用,首先阐述了调速器电气控制柜配置、机械液压系统控制原理、分段关闭阀设计原理,其次参照国家和行业标准,对现场调速器开机、背靠背启动、抽水转调相、一次调频、甩负荷试验、水泵断电等工况转换和大波动过渡过程进行了分析,最终表明阳江调速器设计和试验性能满足标准要求,有力发挥了我国抽水蓄能机组对新型电力系统的支撑作用,可为大型抽水蓄能机组调速系统的制造及试验、国产化提供一定的参考。 In this paper the design features and on-site application of the speed governing system of the 400MW super-large pumped storage units in Yangjiang were mainly introduced.The configuration of the governor electrical control cabinet,the control principle of the mechanical hydraulic system,and the design method of the step closure device were elaborated firstly.And then the on-site governor startup,back-to-back startup,pumping and phase modulation conversion,primary frequency regulation,load shedding test,pump poweroff and other working conditions switch and large fluctuation transient processes were analyzed referred to the national and industry standards.The design and test performance of Yangjiang governor were finally indicated to meet the standard requirements,which would strongly support the role of China’s pumped-storage units in the new power system and provide reference for the manufacture,test and localization of the speed governing units of large pumped storage systems.
作者 蔡卫江 杨小龙 汤德海 陈阳 王昱 CAI Weijiang;YANG Xiaolong;TANG Dehai;CHEN Yang;WANG Yu(NARI Group Co.Ltd.,Nanjing 211106,China;China Southern power grid peak shaving and frequency modulation power generation Co.Ltd.,Guangzhou 510630,China)
出处 《水电与抽水蓄能》 2023年第4期76-84,共9页 Hydropower and Pumped Storage
关键词 特大型抽水蓄能机组 调速器 一次调频 过渡过程 现场试验 super large pumped storage unit governor primary frequency regulation transient process on-site test
  • 相关文献

参考文献8

二级参考文献66

共引文献90

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部