摘要
广州CIM平台要求涵盖建设工程竣工验收备案。而归集至CIM平台上的工程竣工验收备案数据均应满足完整性、合规性与一致性的要求。为实现竣工验收备案数据间对比与检查,需建立数据间的相互挂接与关联。经研究对比,采用一套适宜的编码方案体系能很好地解决这些问题。同时,通过多种唯一性编码方案体系研究比对,采用分部分项复合编码的方案更利于建设工程竣工验收备案在CIM平台上的实现。
Guangzhou CIM platform requires to cover completed acceptance registration and the data collected into the CIM platform is prescribed to be integrated,compliant and consistent.To carry out the comparison and inspection of the completed acceptance registration,it is necessary to establish the connection and association between the data.An appropriate coding scheme system can solve these problems well after research and comparison in the paper,meanwhile the partial and sub-item composite coding scheme is more conducive to integrate completed acceptance registration on CIM platform.
作者
罗冠鑫
李兵
万鹏
Luo Guanxin;Li Bing;Wan Peng(China Construction Fourth Engineering Division Co.,Ltd.,Guangzhou 510665,China)
出处
《土木建筑工程信息技术》
2023年第3期53-57,共5页
Journal of Information Technology in Civil Engineering and Architecture
关键词
广州CIM平台
CIM
竣工验收备案
编码
Guangzhou CIM Platform
CIM
Completed Acceptance Registration
Coding