摘要 柿子园隧道合分修过渡段开挖面积达345 m^(2),且该段穿越王家坪1号断层,存在高地应力。为解决穿越高地应力断层带的超大断面隧道面临的初期支护变形、二次衬砌开裂等修建难题,根据地质情况,采用数值模拟和工程类比相结合的方法,对隧道断面形状进行比选,确定结构支护参数,并提出一种新的施工方法。实践表明,该工法能解决柿子园隧道施工难度大、变形不易控制等问题。 The excavation area of the transition section of combined and separate construction in the Shiziyuan Tunnel is 345 m^(2),and this transition section passes through Wangjiaping No.1 fault with high geostress.In order to solve construction problems faced by super-large section tunnel crossing the fault zone with high geostress,such as primary support deformation and secondary lining cracking,a combination of numerical simulation and engineering analogy is used based on geological conditions to compare and select the tunnel section form,determine structural support parameters,and propose a new construction method.Practice shows that this construction method can solve problems such as difficulty in tunnel construction and difficulty in controlling deformation.
作者 陈锡武 卿伟宸 刘国强 CHEN Xiwu;QING Weichen;LIU Guoqiang(China Railway Eryuan Engineering Group Co.,Ltd.,Chengdu 610031;China Railway 19th Bureau Group Coporation limited,Beijing 100176)
出处 《现代隧道技术》 CSCD 北大核心 2023年第4期204-212,共9页 Modern Tunnelling Technology
关键词 铁路隧道 合分修过渡段 超大断面 高地应力 断层破碎带 变形 Railway tunnel Transition section of combined construction and separate construction Super-large section High geostress Fault fracture zone Deformation
  • 相关文献

参考文献11

二级参考文献84

共引文献258

同被引文献43

引证文献5

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部