期刊文献+

基于DIMINE软件的露天采剥量计算方法的研究

Study on Calculation Method of Opencast Stripping Amount Based on DIMINE Software
下载PDF
导出
摘要 采剥工程量是衡量采剥作业成绩的重要指标,也是采剥工程款结算的重要依据和保障。露天矿山常用的采剥工程量验收计算方法包括断面法、方格网法、三角网法等。本文通过分析和对比玉龙铜矿采剥工程量的几种计算方法,结合数字矿山软件“DIMINE”的三维实体建模功能,实现了采剥工程量计算精度的优化,提高了内业计算工作效率,为后续工作的开展提供了可靠的数据图纸资料。 The amount of mining and stripping is a very important index to evaluate the results of mining and stripping operations,and it is also an important basis and guarantee for the payment of mining and stripping projects.The acceptance calculation methods for mining and stripping quantities in open pit mines include section method,grid method and triangulation method.In this paper,through the analysis and comparison of calculation methods of several Yulong copper mining and stripping quantity of the function of 3D modeling combined with the software of“Digital mine DIMINE”,to realize the optimization of mining engineering volume calculation accuracy,improve work efficiency and calculation within the industry,for the follow-up development of reliable data to provide data drawings.
作者 严贵善 祁天明 陈显毅 YAN Guishan;QI Tianming;CHEN Xianyi(Tibet Yulong Copper Industry Co.,Ltd.,Changdu,Tibet 854000,China)
出处 《自动化应用》 2023年第16期179-181,共3页 Automation Application
关键词 玉龙铜矿 采剥工程计算 DIMINE 三维实体建模 Yulong copper mine mining and stripping engineering DIMINE 3D solid modeling
  • 相关文献

参考文献4

二级参考文献22

共引文献102

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部