摘要
为了解决隧道掘进超挖和超耗严重的问题,杭温铁路3标项目隧道施工创新采用了聚能水压爆破技术。实施过程中,根据聚能水压爆破技术原理,对炮孔布置及钻孔、炮孔装药及起爆连线等关键步骤进行了技术研究和创新,通过现场应用实践,取得了显著的效果,对类似工程具有一定的参考价值。
In order to achieve the efficiency of the tunnel construction of the third standard project of Hangzhou-Wenzhou railway,and solve the serious problems of over-excavation and over-consumption in tunnel tunneling,the shaped charge water pressure blasting technology is adopted.In the process of implementation,according to the principle of shaped charge water pressure blasting technology,the key steps of hole layout,hole drilling,hole charging and initiation line are studied and optimized.Through the field application records,remarkable results are obtained,which has a certain reference value for similar projects.
作者
武兆弛
高远
陶峰
张飞
WU Zhaochi;GAO Yuan;TAO Feng;ZHANG Fei(Shanghai Civill Engineering Group Co.LTD of crec,Zhe Jiang,Jin Hua 322300 China)
出处
《铁路工程技术与经济》
2023年第4期24-29,34,共7页
Railway Engineering Technology and Economy
基金
中国中铁股份有限公司科技研究开发计划重点课题(2022-重点-41)。
关键词
聚能
水压
光面爆破