摘要
某多功能支持船改装,要求潜水系统各设备采用模块化配置,且装船后主甲板上设备可实现整体拆除和回装。本文介绍了该改装船潜水系统主要设备布置和安装的步骤及方法,以及安装过程中使用的工装,为同类型船改装工程提供借鉴。
In order not to affect other engineering operations of the ship,the diving equipment adopts modular production mode,and the equipment on the main deck can be dismantled and reloaded after loading.In this paper,according to the layout and requirements of the installation of the diving system for a multifunctional support ship,the steps and methods of the layout and installation of the main equipment of the diving system are described,and the tooling used in the installation process is introduced,which provides a reference for the same type of renovation project.
作者
林丰财
LIN Fengcai(China Merchants Heavy Industry(Shenzhen)Co.,Ltd.,Shenzhen 518000)
出处
《广东造船》
2023年第4期69-72,共4页
Guangdong shipbuilding
关键词
设备
安装
潜水系统
devices
installation
diving system