船舶物资采购纳期的风险因素分析和控制

Analysis and Control of Risk Factors in the Delivery Period of Ship Material Procurement
下载PDF
导出
摘要 船舶建造工程项目中,物资采购是其中的重要一环,许多大型设备和长线生产周期的重大设备,如发电机、主机、锅炉等,采购周期往往较长,并面临很多风险因素,影响采购设备按时到货,甚至直接影响整个建设工程项目的进度。本文以系统工程的方法,采取建立ISM模型对采购风险进行分析和提出风险控制措施,以提升采购效率和进度,降低进度风险,增强项目管理。 In the shipbuilding project construction,the material procurement is an important part,in which many large-scale equipment and major equipment with long production cycle,such as generators,main engines,boilers,etc,often have a long procurement cycle and face many risk factors,which affect the timely arrival of purchased equipment.This paper adopts the method of system engineering to establish ISM model to analyze and study the procurement risk and put forward risk control measures,so as to improve the procurement efficiency and progress,while reduce the schedule risk and enhance the project management.
作者 刘坚金 LIU Jianjin(Guangzhou Shipbuilding International Co.,Ltd.,Guangzhou 511462)
出处 《广东造船》 2023年第4期115-117,共3页 Guangdong shipbuilding
关键词 设备采购 ISM模型 交货纳期 风险因素 equipment procurement ISM model delivery date risk factors
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部