莫莫克水库进场T型桥梁施工架设

Construction andErection of T-shaped Bridge for Mobilization of Momoke Reservoir
下载PDF
导出
摘要 大跨度超重量装配式预应力钢筋混凝土T型简支梁运输、吊装、转运、架设均是施工中的重点项目,介绍了35m长120t重的装配式预应力钢筋混凝土T型简支梁的运输、吊装、转运、架设等具体施工操作过程,提出了施工注意事项。 Transportation,hoisting,transportation,and erection of large-span and ultra weight prefabricated prestressed reinforced concrete T-shaped simply supported beams are key projects in construction.This paper introduces the specific construction process of transportation,lifting,transportation,and erection of a prefabricated prestressed reinforced concrete T-shaped simply supported beam with a length of 35m and a weight of 120t,and proposes construction precautions.
作者 石育铭 SHI Yu-ming(Xinjiang Institute of Water&Hydropower Engineering Investigation,Design and Research Co.,Ltd.,Urumqi 830000,China)
出处 《云南水力发电》 2023年第9期213-215,共3页 Yunnan Water Power
关键词 莫莫克水库 装配式预应力钢筋混凝土T型简支梁 桥梁架设 施工事项 Momoke Reservoir prefabricated prestressed reinforced concrete t-shaped simply supported beam bridge erection construction matter
  • 相关文献

参考文献9

二级参考文献48

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部