渠首工程除险分析及加固补强技术研究

Analysis of Risk Removal and Research on Reinforcement Technology for Canal Head Engineering
下载PDF
导出
摘要 以新疆叶县江卡渠首除险加固项目作为研究背景,针对工程现状泄洪闸冲沙闸老旧损毁严重、泄洪道冲刷岸坡垮塌的现状,在工程地质条件基础上,对河道的冲淤演变进行了分析,复核了渠首的规模和调动能力,并提出拆除闸室底板浆砌石而后浇筑混凝土,拆除重建冲砂闸和泄洪闸后消能设施及导流堤,对上游导流堤进行护坡加固的系统方案。有效解决了江卡渠首的稳定性安全问题。 In this paper,the research background is Jiangka CanalHeadReinforcement Project in Yexian County,Xinjiang.In view of the current situation of the project,the sluice and scouring sluice are seriously damaged,and the flood control channel is scouring the bank slope and collapsing.On the basis of engineering geological conditions,the evolution of erosion and sedimentation in the river channel was analyzed,and the scale and mobilization capacity of the canal head were reviewed.And a systematic plan was proposed to dismantle the masonry of the bottom plate of the gate chamber and then pour concrete,dismantle and rebuild the energy dissipation facilities and diversion embankment behind the flushing and flood discharge gates,and reinforce the upstream diversion embankment with slope protection.It effectively solves the stability and safety issues of the Jiangka Canal Head.
作者 陈华剑 CHEN Hua-jian(Jiangxi Ganyu Engineering Construction Co.,Ltd,Nanchang 330000,China)
出处 《云南水力发电》 2023年第9期237-241,共5页 Yunnan Water Power
关键词 渠首 除险加固 供水设计 枢纽调度 canal head risk removal and reinforcement water supply design hub dispatch
  • 相关文献

参考文献8

二级参考文献28

  • 1《碾压式土石坝设计规范》(SL274-2001).
  • 2《水利水电工程施工组织设计规范》(SL303-2004).
  • 3中华人民共和国水利部.《灌溉与排水工程设计规范》(GB50288-99)[S].2001.
  • 4SL211-2006.《水工建筑物抗冰冻设计规范》.
  • 5中华人民共和国水利行业标准《渠道防渗工程技术规范》(SLl8-2004),2004.
  • 6《渠系工程抗冻胀设计规范》SL23-2006.
  • 7宋鑫.于田县解放渠首除险加固工程初步设计[J].
  • 8《水利水电工程围堰设计导则》DL/T5087-1999.
  • 9袁新明,曹邱林.上下游水位对平底板水闸闸堰出流淹没界限的影响[J].水利学报,1997(11):77-83. 被引量:8
  • 10佘清荣.重力式挡墙组合加固方法应用[J].福建建筑,2010(2):97-99. 被引量:13

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部