摘要 为实现对地下综合管廊实际施工过程的仿真、有效解决施工中沟通效率低,无法保证工程施工质量的问题,本研究将开展基于BIM-XR的地下综合管廊工程施工质量精益化控制研究。以某地下综合管廊工程项目为例,通过基于BIM-XR的精益化控制总流程设计、事前控制设计、事中控制设计和事后控制设计,提出一种新的控制方案。通过应用新的控制方案可以实现对施工的模拟,并有效促进施工质量的提升。 In order to achieve simulation of the actual construction process of underground comprehensive pipe gallery and effectively solve the problem of low communication efficiency and inability to ensure the quality of engineering construction during construction,this article will conduct a study on lean control of construction quality of underground comprehensive pipe gallery engineering based on BIM-XR.Taking a certain underground comprehensive pipe gallery project as an example,a new control scheme is proposed through the design of lean control overall process,pre control design,in-process control design,and post control design based on BIM-XR.By applying new control schemes,simulation of construction can be achieved and the improvement of construction quality can be effectively promoted.
作者 刘靖 Liu Jing(Wuhan City Vocational College,Wuhan,China)
出处 《科学技术创新》 2023年第21期189-192,共4页 Scientific and Technological Innovation
基金 武汉城市职业学院科研创新团队建设计划资助。
关键词 BIM-XR 综合管廊 精益化 施工质量 工程 地下 BIM-XR comprehensive pipe gallery lean construction quality engineering underground
  • 相关文献

二级参考文献29

共引文献24

同被引文献21

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部