期刊文献+

柔性直流传输工程交流场主接线的案例分析

Case Analysis of Main Electrical Wiring of AC Field in the VSC-HVDC Project
下载PDF
导出
摘要 阐述换流站电气主接线的推荐方案,利用变电站电气主接线可靠性评估软件进行可靠性计算,分别从运行维护、本期新建和远期超规模扩建三方面进行分析比较。建议南通道西侧采用3/2接线,提高可靠性和运维的便利性。 This paper describes the west side of the converter station. The Reliability assessment software for main electrical wiring of substation is used to calculate the reliability. The reliability is analysed and compared from three aspects: operation and maintenance, current construction and long-term super-scale expansion. It is recommended to use 3/2 cables on the west side of the south channel to improve reliability and convenience of operation and maintenance.
作者 张天龙 邓长红 殷勤 黄阳 李沛准 ZHANG Tianlong;DENG Changhong;YIN Qin;HUANG Yang;LI Peizhun(Electric Power Planning&Engineering Institute,Beijing 100120,China;Guangdong Electric Power Design Institute,Guangdong 510663,China)
出处 《集成电路应用》 2023年第7期73-75,共3页 Application of IC
关键词 交流接线 柔性直流 背靠背换流站 可靠性 AC electrical wiring VSC-HVDC back to back converter station reliability
  • 相关文献

参考文献9

二级参考文献52

共引文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部