政府投资项目初步设计概算的评审管理探究

Research on Evaluation and Management of Preliminary Design Budget for Government Investment Projects
下载PDF
导出
摘要 随着政府投资项目数量迅速增加,初步设计概算作为政府投资的最高限额,对政府投资项目推进有着承前启后的作用,因此,政府投资项目评审尤为重要。主要对初步设计概算评审的相关方法、要点、规范及标准进行研究,并以道路类项目为例解析评审资料审查完整性的注意事项,能够有效提高政府投资项目初步设计概算的编制质量,增加投资效益。 With the rapid increase in the number of government investment projects,the preliminary design estimate,as the maximum limit of government investment,plays a connecting role in promoting government investment projects.Therefore,the evaluation of government investment projects is particularly important.This study mainly focuses on the relevant methods,key points,specifications,and standards for the review of preliminary design estimates,and takes road projects as an example to analyze the considerations for the completeness of review data review.This can effectively improve the quality of the preparation of preliminary design estimates for government investment projects and increase investment benefits.
作者 王秋英 Wang Qiuying(Shenzhen Jinxiucheng Engineering Cost Consulting Co.,Ltd,Shenzhen,Guangdong 518000)
出处 《现代工程科技》 2023年第12期89-92,共4页 Modern Engineering Technology
关键词 政府投资 初步设计概算 评审 government investment preliminary design estimate review
  • 相关文献

参考文献3

二级参考文献7

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部