摘要
通过分析武汉某数据中心项目空调负荷情况,进行冷热源系统设计。通过冷热源方案对比,对比分析初投资及运行能耗,探讨如何选择适合的冷热源方案,达到整个项目综合能效的最佳利用效率;对比分析各种工况下的主机运行策略。
By analyzing the air conditioning load of a data center project in Wuhan,the design of the cooling and heating source system was carried out.Through the comparison of cold and heat source schemes,the initial investment and operating energy consumption are compared and analyzed,and how to select the appropriate cold and heat source scheme is discussed to achieve the best utilization efficiency of the comprehensive energy efficiency of the whole project.Compare and analyze the host operation strategies under various working conditions.
作者
李玲玲
李严
Li Ling-ling;Li Yan
出处
《建筑技术开发》
2023年第9期148-150,共3页
Building Technology Development
关键词
数据中心
冷热源
四管制风冷热泵
运行策略
data center
cold and heat sources
four pipe air-cooled hot pump
run policy