工程项目管理中工期-成本-质量综合均衡优化分析

Comprehensive Balance Optimization Analysis of Construction Period-Cost-Quality in Engineering Project Management
下载PDF
导出
摘要 近几年,伴随工程建设规模逐渐增大,给工程项目管理工作增加极大难度,在进行工程管理时,必须要加强管理理论和实际有效融合,并且合理应用信息技术。工程工期、成本与质量间具有紧密联系,三者间任何一个发生变化,则会联动其他因素发生变化,因此必须高度关注工程工期、成本与质量综合均衡优化。对此,本文对工程项目管理中工期、成本与质量问题进行分析,并探讨工期-成本-质量综合均衡优化策略,以提供相关借鉴。 In recent years,with the gradually expanding scale of engineering construction,it brings extreme difficulty on engineering project management.It is necessary to strengthen the effective integration of management theory and practice,and rationally apply information technology when carrying out engineering management.There is a close relationship among construction period,cost and quality,and any change in any of these three factors will be associated with changes in other factors,so it is necessary to focus on the comprehensive balance optimization of construction period,cost and quality.Therefore,this paper analyzes the problems of construction period,cost and quality in engineering project management,and discusses the comprehensive balance optimization strategy of construction period-cost-quality to provide relevant references.
作者 郭正安 Guo Zheng-an(Hunan University,Changsha 410000,Hunan Province,China)
机构地区 湖南大学
出处 《建筑与装饰》 2023年第18期43-45,共3页 Construction & Decoration
关键词 工程项目 管理工作 工期 成本 质量 engineering project management work construction period cost quality
  • 相关文献

参考文献5

二级参考文献21

  • 1李晓峰,徐玖平,王荫清,贺昌政.BP人工神经网络自适应学习算法的建立及其应用[J].系统工程理论与实践,2004,24(5):1-8. 被引量:76
  • 2杨耀红,汪应洛,王能民.工程项目工期成本质量模糊均衡优化研究[J].系统工程理论与实践,2006,26(7):112-117. 被引量:55
  • 3Babu A, Suresh N. Project management with time cost, and quality considerations[J]. European Journal of Operational Research, 1996, 88 ( 2 ): 320-327.
  • 4Ziarati K, Akbari R, Zeighami V. On the performance of bee algorithms for resource- constrained project scheduling problem[J]. Applied Soft Computing, 2011, 11 (4): 3720-3733.
  • 5Azaron A, Tavakkoli - Moghaddam R. Multi- objective time-cost trade-off in dynamic PERT networks using an interactive approach[J]. European Journal of Operational Research, 2007, 180 (3): 1186-1200.
  • 6Ke H, Ma W, Chen X. Modeling stochastic project time-cost trade-offs with time-dependent activity durations [J]. Applied Mathematics and Computation, 2012, 218 ( 18 ): 9462-9469.
  • 7Liu B. Theory and Practice of Uncertain Programming [M]. Phisica-Verlag, Heidelberg, 2002.
  • 8Liu B, Liu Y. Expected value of fuzzy variable and fuzzy expected value models[J]. IEEE Transactions on Fuzzy Systems, 2002, 10 (4): 445-450.
  • 9裴亮,瞿秋风,瞿立新.工程项目管理中质量—工期—成本多目标优化研究[J].水利建设与管理,2009,29(7):23-25. 被引量:11
  • 10王宇静,李永奎.工程项目绿色施工管理多目标均衡优化研究[J].计算机工程与应用,2010,46(10):7-10. 被引量:16

共引文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部