期刊文献+

上海轨道交通1号线富锦路站折返能力分析

Analysis of Shanghai Rail Transit Line 1 Turn-back Capacity at Fujin Road Station
下载PDF
导出
摘要 目的:终端折返站的折返能力是决定整条城市轨道交通线路运输能力的关键因素,因此有必要对既有线路终端折返站的折返能力进行研究,分析提升其折返能力的主要限制条件,优化运营组织模式。方法:以上海轨道交通1号线富锦路站为例,分析富锦路站的折返模式。首先,介绍了富锦路站站场,并定义了折返运行关键点;然后,计算了各关键点间列车的运行时间;接着,分析了富锦路站站前折返、站后折返和前后交替折返3种折返模式,并计算了3种折返模式下,各列车在不同关键点所需的折返时间;最后,对前后交替折返模式进行优化,人为延长列车在站后折返线的停车时间,将所有列车的接车间隔和发车间隔调整为相同时间间隔。结果及结论:单一的站前折返效率较低,列车折返时间间隔与中间站台停站时间线性相关;相比于单一的站前折返,单一站后折返的折返效率较高,列车折返间隔与列车折返线停留时间线性相关;前后交替折返模式中,站后折返列车的运行时间较为充裕,导致站后折返列车需要在折返线上停留较长的时间;优化后的前后交替折返时间间隔为110.28 s。 Objective:Terminal station turn-back capacity is a critical factor determining the overall transportation capacity of urban rail transit lines.Therefore,it is necessary to study the turn-back capacity of existing terminal stations,analyze the main factors limiting the turn-back capacity,and optimize the operation organization mode.Method:Taking Shanghai Rail Transit Line 1 Fujin Road Station as an example,its turn-back mode is analyzed.First,the station layout and key turn-back points are introduced.The time interval between each key point is calculated.Then,the pre-station turn-back,post-station turn-back and alternate turn-back three modes are analyzed,the time interval data required at each key point of the above three is calculated.Finally,the alternate turn-back mode is optimized by artificially extending the train dwell time on post-station turn-back track,adjusting the arrival and departure intervals of all trains to the same duration.Result&Conclusion:The efficiency of single pre-station turn-back is relatively low,and the turn-back time interval is linearly related to the dwell time at intermediate platforms on turn-back track.Compared to single pre-station turn-back,single post-station turn-back has higher turn-back efficiency,while there exists the same linear correlation.In the alternate turn-back mode,the running time for post-station turn-back train is relatively ample,resulting in its longer dwell time on turn-back track.The optimized interval for the alternate turn-back mode is 110.28 seconds.
作者 项仲强 施莉娟 XIANG Zhongqiang;SHI Lijuan(CASCO Signal Ltd.,200072,Shanghai,China;不详)
出处 《城市轨道交通研究》 北大核心 2023年第9期209-213,共5页 Urban Mass Transit
关键词 城市轨道交通 富锦路站 折返能力 urban rail transit Fujin Road Station turn-back capacity
  • 相关文献

参考文献3

二级参考文献13

共引文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部