期刊文献+

全过程工程咨询中建筑供应商信息共享研究

Research on information sharing of construction suppliers in whole-process engineering consulting
下载PDF
导出
摘要 近年来,随着我国经济的不断发展和市场的细分,建设材料在全过程控制与管理中的把控越来越精细化。传统的建筑供应链下,由于建筑供应商之间存在信息壁垒,使得在项目建设的全寿命周期内信息共享程度低,项目决策方案落实情况较差。为了促进建筑供应商成员共享的积极性,提高供应链运行的稳定性,引入随机演化博弈的Moran过程,构建了建筑供应商数据资源共享的动态博弈模型,借助Matlab仿真,分析推动建筑供应商信息共享程度的实现条件,为今后建筑供应商信息共享提供参考。 In recent years,along with the continuous development of our economy,the segmentation of the market,the construction material in the whole process control and management control more and more refined.Under the traditional construction supply chain,information barriers exist among construction suppliers,leading to a low degree of information sharing and poor implementation of project decision plans during the whole life cycle of project construction.In order to promote the enthusiasm of members of construction suppliers to share and improve the stability of supply chain operation,this paper introduces Moran process of stochastic evolutionary game,builds a dynamic game model of data resource sharing of construction suppliers,and analyzes the conditions to promote the realization of information sharing degree of construction suppliers with the help of Matlab simulation.This paper provides reference for information sharing of construction suppliers in the future.
作者 肖凌军 林清宇 金雪松 XIAO Lingjun;LIN Qingyu;JIN Xuesong(School of Water Conservancy and Environment,China Three Gorges University,Yichang 443002)
出处 《福建建筑》 2023年第8期93-97,共5页 Fujian Architecture & Construction
关键词 随机演化博弈 Moran过程 建筑供应商 信息共享 Stochastic evolutionary game Moran process Construction supplier Information sharing
  • 相关文献

参考文献8

二级参考文献61

  • 1孙利辉,崔文田.创新联盟的一对一动态形成机理研究[J].计算机集成制造系统,2004,10(10):1296-1300. 被引量:7
  • 2唐晓波,黄媛媛.SCM协同管理战略及模型评价[J].情报杂志,2005,24(1):88-90. 被引量:22
  • 3盛昭瀚.关于我国重大工程管理若干问题研究[R].镇江:国家自然科学基金委员会第79期双清论坛,2012.
  • 4Richard R B. Industrialised Building Systems: Reproduction before Automation and Robotics [ J ]. Automation in Construction, 2005, 14(4) : 442 -451.
  • 5Khalili A, Chua D. Integrated Prefabrication Configuration and Component Grouping for Resource Optimization of Precast Produc- tion [ J ]. Journal of Construction Engineering and Management, 2014, 140(2). 04013052.
  • 6Zhang Y, Flood I. Planning and Scheduling Prefabrication Construc- tion Projects Using Dependency Structure Matrix[ J]. Computing in Civil and Building Engineering, 2014:1457 -1464.
  • 7Akintoye A, Mclntosh G, Fitzgerald E. A Survey of Supply Chain Collaboration and Management in the UK Construction Industry[ J]. European Journal of Purchasing & Supply Management, 2000, 6 (3) :159 -168.
  • 8Saad M, Jones M, James P. A Review of the Progress towards the Adoption of Supply Chain Management ( SCM ) Relationships in Construction [ J ]. European Journal of Purchasing & Supply Man- agement, 2002, 8(3):173-183.
  • 9Ylimaki J. A Dynamic Model of Supplier - Customer Product De- velopment Collaboration Strategies[ J]. Industrial Marketing Man- agement, 2014, 43(6): 996-1004.
  • 10Song M, Benedetto C A D. Supplier's Involvement and Success of Radical New Product Development in New Ventures[ J]. Journal of Operations Management, 2008, 26 ( 1 ) : 1 - 22.

共引文献202

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部