摘要
我国造船业正从传统造船向高端海工和豪华邮轮建造转型,在工艺细节、质量控制方面仍待完善。本文结合某海工项目高压水雾系统的安装、试压、调试到完工验收的过程,总结梳理整个生产流程,探讨各生产环节的优化。
China′s shipbuilding industry is transitioning from traditional shipbuilding to high-end marine engineering and luxury cruise ship construction,and there is still room for improvement in process details and quality control.This paper combines the installation,pressure testing,debugging,and completion acceptance process of a high-pressure water mist system in a certain marine engineering project,summarizes and sorts out the entire production process,and explores the optimization of each production link.
作者
徐亮
于洋
吕文超
XU Liang;YU Yang;LV Wenchao(Jiangsu Shipping College,Nantong,Jiangsu 226010,China;China Merchants Heavy Industry(Jiangsu)Co.,Ltd.,Nantong,Jiangsu 226116,China)
出处
《自动化应用》
2023年第18期127-130,共4页
Automation Application
基金
江苏省海洋科技创新项目(JSZRHYKJ202220)
江苏省高等学校自然科学研究面上项目(21KJD470001)
南通市基础科学研究计划(JCZ21003)。
关键词
高压水雾灭火系统
海洋工程建造
试压
调试
high-pressure water mist system
marine project
pressure test
commissioning